Skip to main content

ᖃᒪᓂᑦᑐᐊᖅ

ᖃᒪᓂᑦᑐᐊᖅ, ᓄᓇᒦᑦᑐᖅ, ᓯᕕᑐᓕᕐᓂᐊᓗᐊᓂ ᑏᓛᓐ ᑰᖓᑕ, ᑲᓂᑦᑑᑦᓴᓂ ᓄᓇᓐᖑᐊᖅᑎᒍᑦ ᕿᑎᖓᓄᑦ ᑲᓇᑕᐅᑉ. ᖃᒪᓂᑦᑐᐊᖅ (ᐃᓄᖏᑦ 1950) ᖃᐅᔨᒪᔭᐅᑦᓯᐊᖅᑐᖅ ᓴᓇᐅᒐᕐᓄᑦ ᓄᓇᓕᓐᓂ. ᓴᓇᐅᒐᕐᓂᕐᒧᑦ ᑎᑎᖅᑐᒐᕐᕖᓪᓗ ᖃᐅᔨᒪᔭᐅᑎᑦᓯᑲᓐᓂᕈᑕᐅᖅᓱᑎᒃ ᓄᓇᓕᓐᓂ ᓴᓇᐅᒐᕐᓂᒃ, ᓲᕐᓗ ᐃᓄᐃᑦ ᐃᑦᓴᕐᓂᑕᒃᑯᕕᖏᑦ, ᔨᐊᓯ ᐅᓇᖅ ᐱᓐᖑᐊᕐᕕᒃ, ᐊᒻᒪᓗ ᒪᑭᒪᑦᓯᐊᖅᑐᑦ ᐃᒻᒥᒃᑯᑦ ᓴᓇᐅᒐᕐᓂᒥᒃ ᑕᑯᔭᒐᖃᕐᕖᑦ, ᐃᑲᔪᖅᓯᒪᓪᓚᕆᑦᑐᑦ ᓄᓇᓕᓐᓂᒃ. ᓄᓇᒥᐅᑕᓕᕆᓂᕐᒧᑦ ᐊᐅᓚᓂᐅᔪᑦ ᐊᑦᑐᐃᓂᖃᓪᓚᕆᖑᓐᓇᕐᒥᔪᑦ ᖃᑭᒪᓇᓱᐊᕐᓂᕐᒥᒃ ᐱᕙᓪᓕᐊᓂᒃᑯᑦ ᖃᒪᓂᑦᑐᐊᕐᒥ. ᐱᕙᓪᓕᐊᒋᐊᒃᑲᓐᓂᕐᓂᐊᕐᒥᔪᖅ ᒪᑐᕚᖕᒃ ᒎᓗᓐᓂᐊᕐᕕᒻᒥ ᓴᖅᑮᒍᑕᐅᓯᒪᒌᖅᓱᓂ ᐊᒥᓱᓂᒃ ᓄᓇᓕᓐᓂ ᐃᖅᑲᓇᔭᐃᖅᑎᓂᒃ. ᑐᑭᓯᒋᐊᒃᑲᓐᓂᕈᒪᒍᑦᓯ ᖃᒪᓂᑦᑐᐊᑉ ᒥᑦᓵᓄᑦ, ᑕᑯᒋᐊᕈᒃ www.bakerlake.ca.

ᓄᓇᓕᖕᓂ ᐊᑐᖅᑐᒃᓴᐅᑕᐅᓪᓗᑎᒃ ᓇᑉᐸᖅᑎᖅᑕᐅᓯᒪᔪᑦ ᑲᓇᑕᒥᐅᓂ ᐅᑭᐅᖅᑕᖅᑐᖓᓂ ᐊᒃᑐᖅᑕᐅᕙᓪᓕᐊᕗᑦ ᓯᓚᐅᑉ ᐊᓯᔾᔨᖅᐸᓪᓕᐊᓂᖓᓄᑦ ᐊᒃᑐᖅᓯᓂᕆᔭᐅᔪᓂ ᓲᕐᓗ ᓄᓇᐅᑉ ᐃᑭᐊᖓᓂ ᖁᐊᖑᐃᓐᓇᐅᔭᖅᑐᖅ  ᐊᐅᒃᐸᓪᓕᐊᓕᖅᖢᓂ, ᓯᒡᔭ ᓱᕋᖅᐸᓪᓕᐊᓕᖅᖢᓂ, ᐊᓯᔾᔨᖅᑐᓄᓪᓗ ᓯᓚᐅᑉ ᓂᒡᓚᓱᖕᓂᕆᕙᒃᑕᖏᓐᓄᑦ ᒪᖁᒃᐸᖕᓂᕐᒧᓪᓗ ᖃᓄᐃᓕᖓᓂᕆᕙᒃᑕᖓᓄᑦ.  ᑕᒪᒃᑯᐊ ᐃᓱᒪᒥᐅᑕᕆᓪᓗᒋᑦ, ᐊᑐᖅᑕᐅᕙᒃᑐᓄᑦ ᑲᑎᒪᔩᑦ ᑲᓇᑕᒥ ᐋᖅᑭᒃᓯᒪᓕᖅᑎᑦᑎᓚᐅᖅᐳᑦ ᐆᒥᖓ, ᐅᑭᐅᖅᑕᖅᑐᒥ ᓄᓇᓕᖕᓂ ᐊᑐᖅᑕᐅᔪᒃᓴᐅᑕᐅᓪᓗᑎᒃ ᓇᑉᐸᖅᑎᖅᑕᐅᓯᒪᔪᓄᑦ ᐊᑕᐅᓰᓐᓇᒃᑰᖅᑎᑦᑎᓕᕐᓂᕐᒧᑦ ᐱᒋᐊᖅᑕᐅᓯᒪᔪᒥᒃ (NISI−ᒥᒃ), ᑖᒃᑯᐊᓗ ᓴᖅᑭᑎᑦᑎᕙᒃᖢᑎᒃ ᐊᑐᖅᑕᐅᕙᒃᑐᓂᒃ

What is Mercury/Methylmercury and what are its properties and potential harmful effects on the arctic?

Mercury (Hg) is a toxic heavy metal that changes into various chemical forms through geochemical processes.  It is an element that occurs naturally in the environment but with industrialization, humans have altered itc cycle by adding more mercury in the water, air and soil.

The Nunavut Climate Change Partnership (NCCP) was a collaborative partnership between the Government of Nunavut, Aboriginal Affairs and Northern Development Canada, and Natural Reosurces Canada to build capacity for community-level adaptation planning.

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
Appliance Replacement
Domestic Water Retrofits
Building Envelope Sealing

Energy efficient system to maintain ice surface in Baker Lake Arena

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Gym Lighting Redesign (LED)
Lighting Controls
AHU VAV Conversion / Demand Control
Removable Valve Covers
New Building Automation System Installation
Boiler System Controller Installation
Domestic Water Retrofits

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
Appliance Replacement
Domestic Water Retrofits
Building Envelope Sealing

Energy efficient system to maintain ice surface in Baker Lake Arena

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
New Building Automation System Installation
Domestic Water Retrofits
Building Envelope Sealing

EcoENERGY provided funding for District Heating Systems installed on QEC power plants in Iqaluit, Arviat, Baker Lake and Rankin Inlet.

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
New Building Automation System Installation
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Gym Lighting Redesign (LED)
Lighting Controls
Parking Receptacle Control
AHU VAV Conversion / Demand Control
Variable Flow Pumping
Removable Valve Covers
Controls Recommissioning (Controls Contractor Scope)

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
New Building Automation System Installation
Domestic Water Retrofits
Building Envelope Sealing

EcoENERGY provided funding for District Heating Systems installed on QEC power plants in Iqaluit, Arviat, Baker Lake and Rankin Inlet.

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Gym Lighting Redesign (LED)
Lighting Controls
AHU VAV Conversion / Demand Control
Removable Valve Covers
New Building Automation System Installation
Boiler System Controller Installation
Domestic Water Retrofits

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
Appliance Replacement
Domestic Water Retrofits
Building Envelope Sealing

Energy efficient system to maintain ice surface in Baker Lake Arena

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Gym Lighting Redesign (LED)
Lighting Controls
AHU VAV Conversion / Demand Control
Removable Valve Covers
New Building Automation System Installation
Boiler System Controller Installation
Domestic Water Retrofits

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
Appliance Replacement
Domestic Water Retrofits
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Gym Lighting Redesign (LED)
Lighting Controls
Parking Receptacle Control
AHU VAV Conversion / Demand Control
Variable Flow Pumping
Removable Valve Covers
Controls Recommissioning (Controls Contractor Scope)

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
New Building Automation System Installation
Domestic Water Retrofits
Building Envelope Sealing

EcoENERGY provided funding for District Heating Systems installed on QEC power plants in Iqaluit, Arviat, Baker Lake and Rankin Inlet.

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
New Building Automation System Installation
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Gym Lighting Redesign (LED)
Lighting Controls
Parking Receptacle Control
AHU VAV Conversion / Demand Control
Variable Flow Pumping
Removable Valve Covers
Controls Recommissioning (Controls Contractor Scope)

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
New Building Automation System Installation
Domestic Water Retrofits
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Gym Lighting Redesign (LED)
Lighting Controls
AHU VAV Conversion / Demand Control
Removable Valve Covers
New Building Automation System Installation
Boiler System Controller Installation
Domestic Water Retrofits

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
Appliance Replacement
Domestic Water Retrofits
Building Envelope Sealing

Energy efficient system to maintain ice surface in Baker Lake Arena

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Gym Lighting Redesign (LED)
Lighting Controls
AHU VAV Conversion / Demand Control
Removable Valve Covers
New Building Automation System Installation
Boiler System Controller Installation
Domestic Water Retrofits

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
New Building Automation System Installation
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Gym Lighting Redesign (LED)
Lighting Controls
Parking Receptacle Control
AHU VAV Conversion / Demand Control
Variable Flow Pumping
Removable Valve Covers
Controls Recommissioning (Controls Contractor Scope)

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
New Building Automation System Installation
Domestic Water Retrofits
Building Envelope Sealing

EcoENERGY provided funding for District Heating Systems installed on QEC power plants in Iqaluit, Arviat, Baker Lake and Rankin Inlet.

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
New Building Automation System Installation
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Gym Lighting Redesign (LED)
Lighting Controls
Parking Receptacle Control
AHU VAV Conversion / Demand Control
Variable Flow Pumping
Removable Valve Covers
Controls Recommissioning (Controls Contractor Scope)

Energy efficient system to maintain ice surface in Baker Lake Arena

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Gym Lighting Redesign (LED)
Lighting Controls
AHU VAV Conversion / Demand Control
Removable Valve Covers
New Building Automation System Installation
Boiler System Controller Installation
Domestic Water Retrofits

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
Appliance Replacement
Domestic Water Retrofits
Building Envelope Sealing

Energy efficient system to maintain ice surface in Baker Lake Arena

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
Building Envelope Sealing

EcoENERGY provided funding for District Heating Systems installed on QEC power plants in Iqaluit, Arviat, Baker Lake and Rankin Inlet.

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
New Building Automation System Installation
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Gym Lighting Redesign (LED)
Lighting Controls
Parking Receptacle Control
AHU VAV Conversion / Demand Control
Variable Flow Pumping
Removable Valve Covers
Controls Recommissioning (Controls Contractor Scope)

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
New Building Automation System Installation
Domestic Water Retrofits
Building Envelope Sealing

EcoENERGY provided funding for District Heating Systems installed on QEC power plants in Iqaluit, Arviat, Baker Lake and Rankin Inlet.

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
New Building Automation System Installation
Building Envelope Sealing