Skip to main content

Baker Lake

Baker Lake, or Qamani’tuuq,is situated inland, at the huge widening of the mouth of the Thelon River, close to the geographic centre of Canada. Baker Lake (pop. 1,950) is well known for its arts and craft community. Artists and studios promoting local arts and crafts, such as the Inuit Heritage Centre, the Jessie Oonark Centre, and well-established independent art galleries, are assets to the community.

The natural resource industry could also have a significant impact on the economic development of Baker Lake. Further development of the Meadowbank gold deposit has already created numerous local hires. For more information about Baker Lake, visit www.bakerlake.ca.

No Adaptation Projects available at the moment.

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Gym Lighting Redesign (LED)
Lighting Controls
AHU VAV Conversion / Demand Control
Removable Valve Covers
New Building Automation System Installation
Boiler System Controller Installation
Domestic Water Retrofits

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
Appliance Replacement
Domestic Water Retrofits
Building Envelope Sealing

Energy efficient system to maintain ice surface in Baker Lake Arena

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Gym Lighting Redesign (LED)
Lighting Controls
AHU VAV Conversion / Demand Control
Removable Valve Covers
New Building Automation System Installation
Boiler System Controller Installation
Domestic Water Retrofits

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
New Building Automation System Installation
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Gym Lighting Redesign (LED)
Lighting Controls
Parking Receptacle Control
AHU VAV Conversion / Demand Control
Variable Flow Pumping
Removable Valve Covers
Controls Recommissioning (Controls Contractor Scope)

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
New Building Automation System Installation
Domestic Water Retrofits
Building Envelope Sealing

EcoENERGY provided funding for District Heating Systems installed on QEC power plants in Iqaluit, Arviat, Baker Lake and Rankin Inlet.

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
New Building Automation System Installation
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Gym Lighting Redesign (LED)
Lighting Controls
Parking Receptacle Control
AHU VAV Conversion / Demand Control
Variable Flow Pumping
Removable Valve Covers
Controls Recommissioning (Controls Contractor Scope)

Energy efficient system to maintain ice surface in Baker Lake Arena

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Gym Lighting Redesign (LED)
Lighting Controls
AHU VAV Conversion / Demand Control
Removable Valve Covers
New Building Automation System Installation
Boiler System Controller Installation
Domestic Water Retrofits

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
Appliance Replacement
Domestic Water Retrofits
Building Envelope Sealing

Energy efficient system to maintain ice surface in Baker Lake Arena

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
Building Envelope Sealing

EcoENERGY provided funding for District Heating Systems installed on QEC power plants in Iqaluit, Arviat, Baker Lake and Rankin Inlet.

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
New Building Automation System Installation
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Gym Lighting Redesign (LED)
Lighting Controls
Parking Receptacle Control
AHU VAV Conversion / Demand Control
Variable Flow Pumping
Removable Valve Covers
Controls Recommissioning (Controls Contractor Scope)

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
New Building Automation System Installation
Domestic Water Retrofits
Building Envelope Sealing

EcoENERGY provided funding for District Heating Systems installed on QEC power plants in Iqaluit, Arviat, Baker Lake and Rankin Inlet.

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
New Building Automation System Installation
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
Appliance Replacement
Domestic Water Retrofits
Building Envelope Sealing

Energy efficient system to maintain ice surface in Baker Lake Arena

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Gym Lighting Redesign (LED)
Lighting Controls
AHU VAV Conversion / Demand Control
Removable Valve Covers
New Building Automation System Installation
Boiler System Controller Installation
Domestic Water Retrofits

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
Appliance Replacement
Domestic Water Retrofits
Building Envelope Sealing

Energy efficient system to maintain ice surface in Baker Lake Arena

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
New Building Automation System Installation
Domestic Water Retrofits
Building Envelope Sealing

EcoENERGY provided funding for District Heating Systems installed on QEC power plants in Iqaluit, Arviat, Baker Lake and Rankin Inlet.

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
New Building Automation System Installation
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Gym Lighting Redesign (LED)
Lighting Controls
Parking Receptacle Control
AHU VAV Conversion / Demand Control
Variable Flow Pumping
Removable Valve Covers
Controls Recommissioning (Controls Contractor Scope)

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
New Building Automation System Installation
Domestic Water Retrofits
Building Envelope Sealing

EcoENERGY provided funding for District Heating Systems installed on QEC power plants in Iqaluit, Arviat, Baker Lake and Rankin Inlet.

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Gym Lighting Redesign (LED)
Lighting Controls
AHU VAV Conversion / Demand Control
Removable Valve Covers
New Building Automation System Installation
Boiler System Controller Installation
Domestic Water Retrofits

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
Appliance Replacement
Domestic Water Retrofits
Building Envelope Sealing

Energy efficient system to maintain ice surface in Baker Lake Arena

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Gym Lighting Redesign (LED)
Lighting Controls
AHU VAV Conversion / Demand Control
Removable Valve Covers
New Building Automation System Installation
Boiler System Controller Installation
Domestic Water Retrofits

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
Appliance Replacement
Domestic Water Retrofits
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Gym Lighting Redesign (LED)
Lighting Controls
Parking Receptacle Control
AHU VAV Conversion / Demand Control
Variable Flow Pumping
Removable Valve Covers
Controls Recommissioning (Controls Contractor Scope)

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
New Building Automation System Installation
Domestic Water Retrofits
Building Envelope Sealing

EcoENERGY provided funding for District Heating Systems installed on QEC power plants in Iqaluit, Arviat, Baker Lake and Rankin Inlet.

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
New Building Automation System Installation
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Gym Lighting Redesign (LED)
Lighting Controls
Parking Receptacle Control
AHU VAV Conversion / Demand Control
Variable Flow Pumping
Removable Valve Covers
Controls Recommissioning (Controls Contractor Scope)

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
New Building Automation System Installation
Domestic Water Retrofits
Building Envelope Sealing