Baker Lake

Baker Lake, or Qamani’tuuq,is situated inland, at the huge widening of the mouth of the Thelon River, close to the geographic centre of Canada. Baker Lake (pop. 1,950) is well known for its arts and craft community. Artists and studios promoting local arts and crafts, such as the Inuit Heritage Centre, the Jessie Oonark Centre, and well-established independent art galleries, are assets to the community.

The natural resource industry could also have a significant impact on the economic development of Baker Lake. Further development of the Meadowbank gold deposit has already created numerous local hires. For more information about Baker Lake, visit www.bakerlake.ca.

Infrastructure in the Canadian Arctic is being affected by climate change impacts such as permafrost thaw, coastal erosion, and changing temperatures and precipitation patterns.  With this in mind, the Standards Council of Canada established the Northern Infrastructure Standardization Initiative (NISI), which creates standards that are specific to infrastructure in the north

The Nunavut Climate Change Centre is devoted to including Nunavut communities in their projects and outreach.  Over the last few years, we have had the opportunity to visit multiple communities including Rankin Inlet, Arviat and Cape Dorset.

What is Mercury/Methylmercury and what are its properties and potential harmful effects on the arctic?

Mercury (Hg) is a toxic heavy metal that changes into various chemical forms through geochemical processes.  It is an element that occurs naturally in the environment but with industrialization, humans have altered itc cycle by adding more mercury in the water, air and soil.

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Gym Lighting Redesign (LED)
Lighting Controls
AHU VAV Conversion / Demand Control
Removable Valve Covers
New Building Automation System Installation
Boiler System Controller Installation
Domestic Water Retrofits

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
Appliance Replacement
Domestic Water Retrofits
Building Envelope Sealing

Energy efficient system to maintain ice surface in Baker Lake Arena

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Gym Lighting Redesign (LED)
Lighting Controls
AHU VAV Conversion / Demand Control
Removable Valve Covers
New Building Automation System Installation
Boiler System Controller Installation
Domestic Water Retrofits

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
Appliance Replacement
Domestic Water Retrofits
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Gym Lighting Redesign (LED)
Lighting Controls
Parking Receptacle Control
AHU VAV Conversion / Demand Control
Variable Flow Pumping
Removable Valve Covers
Controls Recommissioning (Controls Contractor Scope)

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
New Building Automation System Installation
Domestic Water Retrofits
Building Envelope Sealing

EcoENERGY provided funding for District Heating Systems installed on QEC power plants in Iqaluit, Arviat, Baker Lake and Rankin Inlet.

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
New Building Automation System Installation
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Gym Lighting Redesign (LED)
Lighting Controls
Parking Receptacle Control
AHU VAV Conversion / Demand Control
Variable Flow Pumping
Removable Valve Covers
Controls Recommissioning (Controls Contractor Scope)

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
New Building Automation System Installation
Domestic Water Retrofits
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Gym Lighting Redesign (LED)
Lighting Controls
AHU VAV Conversion / Demand Control
Removable Valve Covers
New Building Automation System Installation
Boiler System Controller Installation
Domestic Water Retrofits

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
Appliance Replacement
Domestic Water Retrofits
Building Envelope Sealing

Energy efficient system to maintain ice surface in Baker Lake Arena

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Gym Lighting Redesign (LED)
Lighting Controls
AHU VAV Conversion / Demand Control
Removable Valve Covers
New Building Automation System Installation
Boiler System Controller Installation
Domestic Water Retrofits

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
New Building Automation System Installation
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Gym Lighting Redesign (LED)
Lighting Controls
Parking Receptacle Control
AHU VAV Conversion / Demand Control
Variable Flow Pumping
Removable Valve Covers
Controls Recommissioning (Controls Contractor Scope)

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
New Building Automation System Installation
Domestic Water Retrofits
Building Envelope Sealing

EcoENERGY provided funding for District Heating Systems installed on QEC power plants in Iqaluit, Arviat, Baker Lake and Rankin Inlet.

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
New Building Automation System Installation
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Gym Lighting Redesign (LED)
Lighting Controls
Parking Receptacle Control
AHU VAV Conversion / Demand Control
Variable Flow Pumping
Removable Valve Covers
Controls Recommissioning (Controls Contractor Scope)

Energy efficient system to maintain ice surface in Baker Lake Arena

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Gym Lighting Redesign (LED)
Lighting Controls
AHU VAV Conversion / Demand Control
Removable Valve Covers
New Building Automation System Installation
Boiler System Controller Installation
Domestic Water Retrofits

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
Appliance Replacement
Domestic Water Retrofits
Building Envelope Sealing

Energy efficient system to maintain ice surface in Baker Lake Arena

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
Building Envelope Sealing

EcoENERGY provided funding for District Heating Systems installed on QEC power plants in Iqaluit, Arviat, Baker Lake and Rankin Inlet.

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
New Building Automation System Installation
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Gym Lighting Redesign (LED)
Lighting Controls
Parking Receptacle Control
AHU VAV Conversion / Demand Control
Variable Flow Pumping
Removable Valve Covers
Controls Recommissioning (Controls Contractor Scope)

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
New Building Automation System Installation
Domestic Water Retrofits
Building Envelope Sealing

EcoENERGY provided funding for District Heating Systems installed on QEC power plants in Iqaluit, Arviat, Baker Lake and Rankin Inlet.

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
New Building Automation System Installation
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
Appliance Replacement
Domestic Water Retrofits
Building Envelope Sealing

Energy efficient system to maintain ice surface in Baker Lake Arena

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Gym Lighting Redesign (LED)
Lighting Controls
AHU VAV Conversion / Demand Control
Removable Valve Covers
New Building Automation System Installation
Boiler System Controller Installation
Domestic Water Retrofits

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
Appliance Replacement
Domestic Water Retrofits
Building Envelope Sealing

Energy efficient system to maintain ice surface in Baker Lake Arena

Retrofit measures:
LED Tube Retrofits
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
New Building Automation System Installation
Domestic Water Retrofits
Building Envelope Sealing

EcoENERGY provided funding for District Heating Systems installed on QEC power plants in Iqaluit, Arviat, Baker Lake and Rankin Inlet.

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
New Building Automation System Installation
Building Envelope Sealing

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Gym Lighting Redesign (LED)
Lighting Controls
Parking Receptacle Control
AHU VAV Conversion / Demand Control
Variable Flow Pumping
Removable Valve Covers
Controls Recommissioning (Controls Contractor Scope)

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Lighting Controls
Removable Valve Covers
New Building Automation System Installation
Domestic Water Retrofits
Building Envelope Sealing

EcoENERGY provided funding for District Heating Systems installed on QEC power plants in Iqaluit, Arviat, Baker Lake and Rankin Inlet.

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Exterior)
Parking Receptacle Control
Removable Valve Covers
Building Envelope Sealing