Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Gym Lighting Redesign (LED)
Lighting Controls
AHU VAV Conversion / Demand Control
Variable Flow Pumping
Removable Valve Covers
New Building Automation System Installation
Controls Recommissioning (Controls Contractor Scope)
Boiler System Controller Installation
Building Envelope Sealing
Solar PV

ID_9ab89c5f400fabd1b72cd3da5bc2dcde

Retrofit measures:
LED Tube Retrofits
New LED Fixtures (Interior)
LED Screw In Lamps
New LED Fixtures (Exterior)
Gym Lighting Redesign (LED)
Lighting Controls
AHU VAV Conversion / Demand Control
Removable Valve Covers
New Building Automation System Installation
Boiler System Controller Installation
Domestic Water Retrofits
Building Envelope Sealing